Charlotte County, FL Logo

941.743.1200
默多克圆环18500号
Port Charlotte, FL 33948

Mobile Menu close icon
接近搜索

Gulf Cove Interior Canal design and maintenance dredge project

项目描述

The residents of Gulf Cove have reported that shoaling within the maintained canals has occurred since they were last dredged in 2010. Concerns regarding safe navigation within the canal have been brought to the County’s attention, prompting the initiation of this project. The Gulf Cove Waterway MSBU Committee has requested and approved a budget for survey and design only. Noting construction planning and services will be considered after all data is collected. 阿特金国际公司. was the selected firm. Atkins and Charlotte County negotiated scope and fees, and a PO was issued for the design work. A bathymetric survey will be conducted on all 35 canals within the waterway system, and data will be collected for the design of a -4' MLW depth. The data will be reviewed and presented to the MSBU with a recommendation on whether to proceed with an interior dredge project.

项目位置

Gulf Cove Waterway System, Port Charlotte Fl, 35 Interior Canals.

项目的影响

No negative impacts are expected as a result of this design project. This MSBU can expect to gain improved draft a safe navigation as a result of a dredge event. 

最新的更新

The Gulf Cove interior dredge design project has been in a holding pattern since hurricane Ian. Post storm surveys were conducted to find what changes had accrued to the shoaling within the canal system. 除了, the consulting firm that performed the survey was to determine if significant changes had accrued which would prompt application to FEMA for aid. 不幸的是, there was not enough historical data to produce credible shoaling rates, therefore not providing enough evidence to support such claims. Recently the engineer has updated draft design deliverables for county staff review. Project management is currently reviewing those documents and is planning a project meeting to discuss how to finalize the dredge design project. The dredge design is only months away from being complete for the interior canals. Staff is looking at data collected in the access channels out in the Myakka River to determine if there are other dredging needs. The MSBU Waterway Advisory Board will be updated at the next quarterly meeting. 

6月28日更新, 2024:  Public works staff are planning to combine this project with that for Pirate Harbor with the intention of reducing costs by achieving economies of scale.   

预算

阶段 成本
设计 $42,500.00
工程 $139,190.00
建设 $1,600,000.00
总预算 $1,781,690.00
资金来源: Gulf Cove Waterway MSBU

时间表

阶段 Estimated Start Date 预计完成 实际完成
设计开发 09/21/2020 06/01/2023

支持材料

项目阶段
Planning and Project Approval

最后一次更新
06/28/2024

项目经理
DeWayne Nodine

公共关系
特蕾西·多尔蒂
Email 公共关系

项目数量
c391203

支持部门
公共工程

设计 Engineer/Architect
TBD

建设 Contractor
N/A

Delivering Exceptional Service

问题? 问题?

欧博体育